Hi
We're moving into a property that needs a skim (some old blown plaster) but whilst we're at it I'm going to going to get rid of the wall mounted sockets and fit metal back boxes so obviously I'll be drilling through the old plaster/brick to fit this.
Here's where I'm stuck.....
Have the skim done then do the chiselling and fitting and make good myself or fit the back box whilst the walls are in need of a skim?
I know nothing about plastering and just thought if I fit it flush before the skim then it would be installed below the plaster when the skim was finished or would I leave it a bit proud so the skim matched the level of the back box?
Thanks!
We're moving into a property that needs a skim (some old blown plaster) but whilst we're at it I'm going to going to get rid of the wall mounted sockets and fit metal back boxes so obviously I'll be drilling through the old plaster/brick to fit this.
Here's where I'm stuck.....
Have the skim done then do the chiselling and fitting and make good myself or fit the back box whilst the walls are in need of a skim?
I know nothing about plastering and just thought if I fit it flush before the skim then it would be installed below the plaster when the skim was finished or would I leave it a bit proud so the skim matched the level of the back box?
Thanks!