Hi,
New to the Forum can anyone give me any advice to this,
Looking at replacing my system boiler ( tank fed cylinder etc..) with a combi. Just need some help with how to connect to exsiting pipework)
Is this correct,
Cap of exsiting hot water just past the tee when it comes of the cylinder. Then connect new hot water outlet from boiler to exsiting hot water pipework (15mm)?
The boiler is going to be in a new position so do i just tee into nearest hot water pipework?
Cold will just go into boiler (15mm)
Do I connect new flow and return to exsisting flow and return?
What about the flow and return that was used to heat water in old cylinder?
Any help would be appreciated.
Thanks
New to the Forum can anyone give me any advice to this,
Looking at replacing my system boiler ( tank fed cylinder etc..) with a combi. Just need some help with how to connect to exsiting pipework)
Is this correct,
Cap of exsiting hot water just past the tee when it comes of the cylinder. Then connect new hot water outlet from boiler to exsiting hot water pipework (15mm)?
The boiler is going to be in a new position so do i just tee into nearest hot water pipework?
Cold will just go into boiler (15mm)
Do I connect new flow and return to exsisting flow and return?
What about the flow and return that was used to heat water in old cylinder?
Any help would be appreciated.