Floor levelling badly done by a pro

Joined
30 Aug 2019
Messages
449
Reaction score
7
Country
United Kingdom
So I contracted someone to level my first floor (timber floor).
I just laid the 6mm plywood and applied the proper primer (Mapei Eco Prim); he did the screeding using Mapei Ultraplan Renovation.
He came one day and placed dropsheets all around the walls and filled the biggest gaps using expanding foam.
He came back the day after to do the actual screeding, he used 5 bag for 36 sqm.
After letting everything drying for 24 hours I've gone upstairs to have a look and the result is bad, really bad.
It's basically the same as before, just "painted" with self levelling compound; I still have the same dips where they were before
I saw him using the trowel and the spiked roller, it looked like he was just trowelling the SLC, without actually flooding everything like a swimming pool (which he couldn't have done as he left some important gaps around the perimeter).

What can I do now?
 
Sponsored Links
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top