- Joined
- 7 Dec 2010
- Messages
- 34
- Reaction score
- 1
- Country
From reading the installation manual for a Baxi Duo Tec I note
the importance of flushing a new system to get rid of flux Etc
prior to filling. Should this process also be followed if the system
is later modified? I am having 2 of my rads changed for larger ones
that will require the pipe runs to be lengthened, this will involve about
4 / 6 extra soldered joints. Should it be flushed again?
the importance of flushing a new system to get rid of flux Etc
prior to filling. Should this process also be followed if the system
is later modified? I am having 2 of my rads changed for larger ones
that will require the pipe runs to be lengthened, this will involve about
4 / 6 extra soldered joints. Should it be flushed again?