I'm after some advice as to whether the following is possible.
In the process of refitting my ensuite - I have the floor ripped up and can see the 2.5mm ring main running throught the joists heading towards the bedroom. Is it possible ( after isolating the ring main, testing for dead), to cut the ring, insert choc blocs/junction box, attach additional 2.5mm and run off to a fused spur that will feed a dual fuel towel rail?
Thanks in advance and Merry Christmas
Tnarg
In the process of refitting my ensuite - I have the floor ripped up and can see the 2.5mm ring main running throught the joists heading towards the bedroom. Is it possible ( after isolating the ring main, testing for dead), to cut the ring, insert choc blocs/junction box, attach additional 2.5mm and run off to a fused spur that will feed a dual fuel towel rail?
Thanks in advance and Merry Christmas
Tnarg