OK so just a quick update - not sure if I added a section from when I did the floor but all bar a bit of rendering and extra facia on the rear the workshop is finished and in use
Electrics were completed by a local company.
Double Metal Clad Sockets and Trunking:
Consumer Unit powered using 6mm armoured cable from the CU in the house:
Cabling in through the roof timbers:
We also ran a 4mm armoured cable under the path into our garage ready for re-wiring:
I also added a shelf:
Electrics were completed by a local company.
Double Metal Clad Sockets and Trunking:
Consumer Unit powered using 6mm armoured cable from the CU in the house:
Cabling in through the roof timbers:
We also ran a 4mm armoured cable under the path into our garage ready for re-wiring:
I also added a shelf: