Submitted full plans which I felt were pretty detailed a couple of weeks ago and got a reply saying I needed to include specifications on the following:
Foundation details to BS5328 Part 2.
External walls below & above Damp proof course, including wall ties, bonding, internal finish & insulation
Cavity barriers, lintels,
Flat roof construction including details of warm or cold deck, finishing, firing strips, fire proofing
Windows & doors
Electrics Part P
Plumbing & heating
Above & below drainage details, protection of drains
Air leakage/thermal bridging
Stud partitions
Ventilation
Low energy fittings
u-values for walls, floor, roof, windows & doors
I've got most of the info, but there are a few things in red above that I could do with some pointers on. On second thoughts being a novice, advice on any of it is appreciated
On the flat roof, what fire proofing is necessary? Just plasterboarded/skimmed ceiling?
Electrics part P - what is there to say other than a sparky will be doing that to Part P? Do they need to know where plug sockets are going?
Air leakage and thermal bridging - must say I've not a clue.....
Grateful for any help
Foundation details to BS5328 Part 2.
External walls below & above Damp proof course, including wall ties, bonding, internal finish & insulation
Cavity barriers, lintels,
Flat roof construction including details of warm or cold deck, finishing, firing strips, fire proofing
Windows & doors
Electrics Part P
Plumbing & heating
Above & below drainage details, protection of drains
Air leakage/thermal bridging
Stud partitions
Ventilation
Low energy fittings
u-values for walls, floor, roof, windows & doors
I've got most of the info, but there are a few things in red above that I could do with some pointers on. On second thoughts being a novice, advice on any of it is appreciated
On the flat roof, what fire proofing is necessary? Just plasterboarded/skimmed ceiling?
Electrics part P - what is there to say other than a sparky will be doing that to Part P? Do they need to know where plug sockets are going?
Air leakage and thermal bridging - must say I've not a clue.....
Grateful for any help