Help explaining layout of Consumer Unit

So it looks like I was right, there are two supplies coming into the CU, but they have been joined together at the metering location when a single rate meter was fitted.

At the very least you should remove the misleading "main switch" and "sub circuit switch" labels and add a label to warn people that the CU has multiple supplies.
 
Sponsored Links
Personally I have a go at moving the sub isolator along one and move the left immersion MCB onto the RCD group then the whole of the heating section can be marked up as 'Spare'
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top