- Joined
- 28 Apr 2021
- Messages
- 294
- Reaction score
- 3
- Country
I need to level this bit of chipboard sub floor by the wall to lay engineered flooring. Its about 1.5m by 0.3m in the centre. The deepest bit is 15mm too low, the rest is mostly alot less but more than 3mm. Its glued and screwed in place so I don’t want to take it up really. Its not in a high traffic area. What are my options?
I need to level this bit of sub floor by the wall to lay engineered flooring. Its about 1.5m by 0.3m in the centre. The deepest bit is 15mm too low, the rest is mostly alot less but more than 3mm. Its glued and screwed in place so I don’t want to take it up really. Its not in a high traffic area. What are my options?
I need to level this bit of sub floor by the wall to lay engineered flooring. Its about 1.5m by 0.3m in the centre. The deepest bit is 15mm too low, the rest is mostly alot less but more than 3mm. Its glued and screwed in place so I don’t want to take it up really. Its not in a high traffic area. What are my options?
Last edited: