Hi,
I have just poured some Mapei Ultraplan 3240 self leveller down to level the floor prior to fitting a shower tray. It says that it is walkable after 4-5 hours, does that mean I can install the shower tray after 4-5 hours or do I have to wait for the leveller fully cure first?
Thank you!
I have just poured some Mapei Ultraplan 3240 self leveller down to level the floor prior to fitting a shower tray. It says that it is walkable after 4-5 hours, does that mean I can install the shower tray after 4-5 hours or do I have to wait for the leveller fully cure first?
Thank you!