As above, need the following doing:
35m2 taking down 4" and levelling ready for sub base
16m2 lawn digging down 8" for sub base
10m long footing digging out for retaining block wall (approx 10m long, 600mm wide, 10" deep
I know 'how long is a piece of string' but want to have a bit of a clue when i ring around for quotes
Thanks all
35m2 taking down 4" and levelling ready for sub base
16m2 lawn digging down 8" for sub base
10m long footing digging out for retaining block wall (approx 10m long, 600mm wide, 10" deep
I know 'how long is a piece of string' but want to have a bit of a clue when i ring around for quotes
Thanks all