for an experianced driver with some guys doing the barrow wouldnt take long at all. On your own and if your not used to it then hire it for a weekend. If you hire it for a day most companies wont take it off hire till you tell them youve finished with it, so it doesnt matter if you need longer
I just want to dig the footings and put all the spoil on one side of the garden out of the way. I will then arrange someone to barrow it out
Im trying to do this shed as cheaply as possible so hoping it can be done in a day. I have to break an old concrete base, which I will try and do with my sds drill beforehand