Am building my kitchen and about to fix the base units, but not sure how much drainage plumbing I should put in before the worktops go on and the undermount sink is fitted.
The drainage feeds into a macerator in a corner that I'll only be able to get to through a slimline dishwasher (450mm) gap under the worktops. So it's going to be a pain working under there solvent welding and securing pipework once the worktops are down, but it'd also be hard to get the wastes for two sinks in exactly the right place beforehand.
How much would you build in before the worktops go down and all the units are fixed?
The drainage feeds into a macerator in a corner that I'll only be able to get to through a slimline dishwasher (450mm) gap under the worktops. So it's going to be a pain working under there solvent welding and securing pipework once the worktops are down, but it'd also be hard to get the wastes for two sinks in exactly the right place beforehand.
How much would you build in before the worktops go down and all the units are fixed?