I would be grateful if any of you professionals could give me a rough idea how much it will cost for the following works to be done at the same time:
1) convert open-vented system to pressurised system: boiler is Potterton Profile 60e; F&E is in the loft
2) power flush the whole system
3) replace 6 rad valves
4) install at least 2 drain valves (no drain valve in heating circuit in the whole house)
5) install Immersion Heater
6) replace bath mixer taps (plus install an Isolation Valve for cold water pipe)
7) replace kitchen mixer tap (plus replace both Hot & Cold Isolation valves for the tap)
Thanks
I would be grateful if any of you professionals could give me a rough idea how much it will cost for the following works to be done at the same time:
1) convert open-vented system to pressurised system: boiler is Potterton Profile 60e; F&E is in the loft
2) power flush the whole system
3) replace 6 rad valves
4) install at least 2 drain valves (no drain valve in heating circuit in the whole house)
5) install Immersion Heater
6) replace bath mixer taps (plus install an Isolation Valve for cold water pipe)
7) replace kitchen mixer tap (plus replace both Hot & Cold Isolation valves for the tap)
Thanks