I've literally gutted out the whole house, walls, ceilings floors, everything.
Starting from a clean slate and as part of first fix come Oct, how best to provision everything now? These are my thoughts:
- 2 Cat 6e cables run to each room in the house using conduits with maybe a few more for main TVs / entertainment system
- Wired alarm and wired light sensors and wired Hix(?) CCTV sustem
- Neutral wiring between light switches and certain sockets (to allow for automated blinds etc)
- Relevant GU10 dimmers which take dimmable LEDs
- Phone and intercom system between room not yet decided
- appropriate Cat cable and phone and armoured cable to the garden for future provision
- Cental rack room for all cables, inc router, network switches, photne, CCTV, TV and media distribution point
I currently have a Fibaro top of the range home automation system as I wasn't planning to go down the Lutron route but I'm disliking Fibaro and thinking instead of Vera.
Any further comments to add? Anyone know what cable I should provision for an electronic gate before we build the drive?
Starting from a clean slate and as part of first fix come Oct, how best to provision everything now? These are my thoughts:
- 2 Cat 6e cables run to each room in the house using conduits with maybe a few more for main TVs / entertainment system
- Wired alarm and wired light sensors and wired Hix(?) CCTV sustem
- Neutral wiring between light switches and certain sockets (to allow for automated blinds etc)
- Relevant GU10 dimmers which take dimmable LEDs
- Phone and intercom system between room not yet decided
- appropriate Cat cable and phone and armoured cable to the garden for future provision
- Cental rack room for all cables, inc router, network switches, photne, CCTV, TV and media distribution point
I currently have a Fibaro top of the range home automation system as I wasn't planning to go down the Lutron route but I'm disliking Fibaro and thinking instead of Vera.
Any further comments to add? Anyone know what cable I should provision for an electronic gate before we build the drive?