Ideal Icos he18

Actually you should use five connections this helps with the power supply to the boiler switch live!
You have main L3 N and E
Then switched live L1 from boiler to common on programmer then switched live L2 back from CH on(from endswitch) to boiler.
You can however "get away" with only using 4 with just the power coming back down the switched live.
 
Sponsored Links
So if five connections should be used (They are I've checked the connections) then do I just need to rejoin link 6 on the honeywell board to stop the pump constantly running?
 
Dont know about honeywell wiring centre only know about boiler connections and that it doesnt have or need a pump overrun to dissipate the heat from the boiler :D
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top