BE. point taken regarding the prestressed joist. I will do no further drilling.
BAS. Thank you for the standards, I will follow as directed. However not sure what else I should have done to allow the wires to access the next section of the ceiling without drilling the joist at this point.
Cheers
Z
BAS. Thank you for the standards, I will follow as directed. However not sure what else I should have done to allow the wires to access the next section of the ceiling without drilling the joist at this point.
Cheers
Z