I'm new so not sure whether this is appropriate - so go easy if not but I'd like to get the feedback from some of the experienced gas engineers that might be on here.
For my sins I am a governor at a large school and the gas pipework that serves the main kitchen appliances is being renewed. We've been advised that due to the total potential load (circa 280kW) the new pipework will need to be much larger that the existing if sized correctly.
We're trying to reduce overall load but the caterers want to retain as much equipment as possible so at present it looks as though we'll need 3" pipework for at least a chunk of the run (about 30m in total with say 6 x 90 elbows) run exposed, mainly at high level before then dropping down to run behind the appliances.
I'm told there are options on the pipework material chosen but that the pipework must be welded or pressfit type either copper / stainless steel at that size.
I wondered whether anyone who had experience of this type of pipework had any opinions of what is good / bad / ugly etc.
Many thanks
Texas
For my sins I am a governor at a large school and the gas pipework that serves the main kitchen appliances is being renewed. We've been advised that due to the total potential load (circa 280kW) the new pipework will need to be much larger that the existing if sized correctly.
We're trying to reduce overall load but the caterers want to retain as much equipment as possible so at present it looks as though we'll need 3" pipework for at least a chunk of the run (about 30m in total with say 6 x 90 elbows) run exposed, mainly at high level before then dropping down to run behind the appliances.
I'm told there are options on the pipework material chosen but that the pipework must be welded or pressfit type either copper / stainless steel at that size.
I wondered whether anyone who had experience of this type of pipework had any opinions of what is good / bad / ugly etc.
Many thanks
Texas