Is this GRP roof being done correctly?

I dont know if its me or not but It looks like FLASHBAND has been used on the upstands on the felt???? :eek:
 
Sponsored Links
There is no quality going on there, were is the attention to detail ? You can buy the best resin but you will not get any joy from the manufactures if you have not used osb.3 boards, it looks like they have only done half the job so pay them half the money, because you won't be getting 20 yrs out of that work.
 
As stated that is really BAD now i have seen more.That job will fail without a doubt .So did you have it in writing what he would do,if so then you have got come back ,if not theres not much hope.How much did you pay for the 55sqm ?
If you go on google just put in pictures of fibreglass roof it should give you an idea of finish you should expect
 
sorry forgot to say a proper detail for the parapet
First remove all felt including of the cap stones(or replace)
the fibreglass should carry up and under the cap stones then the cap stones re beded.
 
Sponsored Links
Thanks cotswoldbuilders - you predicted correctedly.

Also mentioned previously was that the works were undertaken during period of rain. I called the builder prior to the work starting to ask him how he intended to go about it given rain forecast and he assured me it would all be weather proofed without problems. But it wasnt the case.

He laid the cheap plys down (nailing through the old felt roof) and put down the first layer of resin. He left all the edges of the roof exposed without any weather proofing and left it when it rained the whole night and some part of the following day. 48 hrs after the first layer of resin went down he coated with the second resin.

Day 3-4 days following the night of rain, water has come through the inside of the ceiling in a bad way! Dripping through the plasterboard and through the downlighter holes. It is worse that before I had the roofer in!

I called the roofer and he said its a minor problem. He said it would have happened anyway over time given there's no insulation and there will be condensation. He now cut a hole in the GRP roof and put a vent in?!? Any views on whether this will resolve the major leak I'm having? and whether this makes my roof any better?

My question is - how can he make the roof better, short of stripping it all off and doing it all again which he has sworn he won't be doing? What actions shall I take?

View media item 43855 View media item 43853
 
Zeberdee - thanks for pointing those out, yeah, they finished with sand and cement around the edges to hide the felt.
 
Firstly, dont use the original roofer, its clear he doesnt know what hes doing.
Apart from ripping the lot of and doing it correctly, which in my opinion should be done, regarding the water thats got in, how do we know you havent got rotten timbers underneath, all covered up.

If you just want to recover the roof, fit OSB T&G boards, screwed not nailed, they will pop back through and puncture membrane.
Then fit new glass fibre roof, or an EPDM roof.
 
Looks like a gypo job. Bet they get nasty when you refuse to pay.
 
Sorry but this is a joke?????? Gotta be!!!

The ''ROOFER'' (which I say in loose terms :rolleyes: ) NAILED the decking???? :eek:

If thats the case then OH DEAR!!!

Sorry, But you've been had, Insist on the job being done RIGHT!!! As you was quoted for.

He also installed a VENT??? LOL. Whats that vent doing??? Where is it connected to?? It may be a.................godknows.
 
Thats one of the biggest piles of crap i've seen, i wouldn't pay anything for it.
 
If you don't mind me asking how much was the cost of that roof if you can call it a roof really????? :eek:
 
That`s a bit rude for a 1st post - on a thread over 2 years old :LOL:
 
29.10.24. Hants UK. DIY NOT. REPLY TO MANEATCHICKEN. This looks like a terrible situation and these roof issues are very distressing. If we could help we would but are in dire circumstances ourselves. We have had 8 different people round here to look at this lean to roof which was capped by 10mm polycarb multiwall fitted the wrong way round and none of the sheets were fixed to each other, they were glued. The sheets are full of water which has no way of draining. They are huge sheets with no way of expanding so huge bows are present. When I was very ill someone put 40 bricks and bits of concrete on the sheets which did still more damage. I found a lot of my tools and equipt were damaged by water so the situation is devastating. We have moved all tools etc into the main bungalow and we can hardly get into the kitchen,bathroom,sitting room. The lean to is fixed to side wall of bungalow and is about 40ft long x6ft wide. The rafters are fixed to the facia of the Bangalow and have inadequete slope. Theres no wall plate,the rafters just lay on the 4.5 inch bricks. The 8 people who looked at it seemed to want to make their first millions and in no way wouild we trust them. One person however has been round to discuss the issue and even put an estimate on the net but theres hardly any details about what they intend to do, how can they expect us to approve the work? He said he would do the work in Nov 2024, just imagine the risk of doing that. Crazy. Do you realise the difference tween an estimate and a quote.No materials are listed and no metion of what thickness PC would be used either. Would his wife go and pay £60 quid to a hairdresser not knowing what they would do. He lives i a two room flat. A 'friend' brought round a young bloke who works for a firm but does moonlighting, he quoted £200 just to drape a tarp over the problem. He is using his firms van. So £200 for about three hours work adds up to about £500 a day wages with no tax or overheads. Thats about £2500 a week. I think its time for me to start a tarp draping firm and get myself a mansion and a Rolls Royce. I wish I was just starting out in life because I would undercut these characters by about 60% and would have 1000s clients. I reckon its time we had a dose of unemployment. In our case we were tricked by sellers,agents,surveyor and it took us 10 yrs to realise that this building is full of bodging that tw teachers signed chqs for. God help the UK. We are working 7 days a week 12 hours a day whilst ill. Now someone has been rounde here explaining all about will/trusts scams This is the second build crisis in our lives, the one before the present involved the builder going to Court. We had no sewage/water/elect/door/window, then all our tools were stolen and I got Legionairs. DOES NO ONE CARE?? This is not the whole story re what we know, its on 40 hard drives.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top