i have just had a ground floor extension built with a vaulted ceiling and have today insulated between the rafters installed kingspan, i have pushed this right up to the membrane below the tiles and i fear i may have done the wrong thing and should have left an air gap. do i need to rip it all down or will it be ok. if i do need to leave an air gap and have not what problems might i expect. i still need to install another layer of 30mm could i leave the air gap between the 100mm and the 30mm.
your promt responses would be appreciated before i start boarding.
TIA
Jamie
your promt responses would be appreciated before i start boarding.
TIA
Jamie