Lead flashing advice

Joined
31 Aug 2005
Messages
4,203
Reaction score
399
Country
United Kingdom
Due to budget constraints im attempting to do as much roofing work myself.
Ive just felt n battened this area, but am not quite sure how you cut in the lead flashing down the side of my dormer extension over my interlocking concrete tiles. Any pointers most appreciated.

2d8n7rc.jpg
 
Sponsored Links
Hi. On tiles you will need to lap 200mm on tiles and 100mm upstand, under what ever material you are using for the dormer cheeks. If you are completing the cheeks first ( allows better access) lay a spare bit of batten up the roof on edge. This will give you the line for the bottom edge of the flashing, fix lead so it sits on the batten. Once you finish the cheeks, remove batten,the tiles will slip under the sheet lead then dress lead to suit. Max length of sheet lead 1.5m for code 4 the lap the next length 75mm measured vertically. Good luck
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top