Hi Guys
Wonder if someone can help
I have a double pitched roof meeting in the middle of which i have to build a lead valley.
The question i have is what upstand do i need to have going up onto the rafters.
Also the angles of each pitch is 25 degrees, which makes the valley really wide as it meets on a rsj, i have to allow for insulation plus 50mm ventilation over the beam.The valley is ending up being about a metre wide. I dont think there is but is there any way of making the valley narrower......
Cheers in advance.