Cheers mate,
The Lengthing of the cables is not a problem, ignore that comment lol
The earth bit, what I mean is in the Existing Light Fitting, there is the Screw Holder, and I cant confirm until unscrewed the cables, but has a Green/Yellow(earth) cable going in either side of the Screw Fitting(just one Screw, not a Junction box).
Where as the once above has just the one earth cable going into Screw Fitting(just one Screw, not a Junction box).
So, going by advice given, I am going to just attach the Earth Cable from New Light Fitting into the Screw Fitting with other Earth Wires coming from Ceiling.
On terms of the Earth cables Connecting, what I mean, is, all Earth cables will just be going into this one Screw Fitting so will be touching, however each cable has the little copper bit on end of cable to cover bare wires sticking out of Plastic Covering, so if these copper bits are all in the Screw Fitting Touching, should this be fine?
The Lengthing of the cables is not a problem, ignore that comment lol
The earth bit, what I mean is in the Existing Light Fitting, there is the Screw Holder, and I cant confirm until unscrewed the cables, but has a Green/Yellow(earth) cable going in either side of the Screw Fitting(just one Screw, not a Junction box).
Where as the once above has just the one earth cable going into Screw Fitting(just one Screw, not a Junction box).
So, going by advice given, I am going to just attach the Earth Cable from New Light Fitting into the Screw Fitting with other Earth Wires coming from Ceiling.
On terms of the Earth cables Connecting, what I mean, is, all Earth cables will just be going into this one Screw Fitting so will be touching, however each cable has the little copper bit on end of cable to cover bare wires sticking out of Plastic Covering, so if these copper bits are all in the Screw Fitting Touching, should this be fine?