I'm taking out approx 3m of load bearing wall (doing the work myself with a little help.) Plans have been drawn up and have spoken to building regs. According to them the lintel I've got would hold a block of flats but when inserting how many acro props should i use on either side of the gap? I was planning on using a scaffold board on either side of the gap with 2 props on each? is this enough? Also how far away from the wall should i put the support? The joists overlap on this wall.
Cheers