The last company i worked for would still run a 10mm earth to the incoming water main, even thought it was a plastic supply pipe and the internal plumbing installation was in plastic too.
The only copper in the houses was always less than 1M long other than were the drops to the boiler and the gas supply was obviously in copper, which would get MEB'd.
Am i correct in thinking that this water bonding was a waste of money?? And not a requirement?
Cheers.
The only copper in the houses was always less than 1M long other than were the drops to the boiler and the gas supply was obviously in copper, which would get MEB'd.
Am i correct in thinking that this water bonding was a waste of money?? And not a requirement?