You'll never beleive me, but here goes.
£200 to have the ceiling plasterboarded and skimmed, then another £400 to have the all the walls bonded, plastered, including straightening the chimney breast ready for the fireplace to go on.
They were a couple of council plasterers who did it as a cash job on the side. They even threw in half an industrial sized tub of tile adhesive for me to fix the marble fireplace on with so I threw in a bottle of rum
£200 to have the ceiling plasterboarded and skimmed, then another £400 to have the all the walls bonded, plastered, including straightening the chimney breast ready for the fireplace to go on.
They were a couple of council plasterers who did it as a cash job on the side. They even threw in half an industrial sized tub of tile adhesive for me to fix the marble fireplace on with so I threw in a bottle of rum