jasperpie said:well i've had british gas out to have a look at what needs to be done - they have advised against a combi condenser and advised to go for a normal tank fed condenser boiler.
I have been told that the 8mm microbore is ok, as are the rad's and will not need changing, although they do recommend to get the system powerflushed - thats if they do the work or not, as i wont be able to get the work commissioned or the warranty on the boiler will become void without it. (incase rubbish in system causes boiler fault)
they have quoted - for the boiler, installation, powerflush, controls, some kind of earth for the gas n elec meters + cold water stop cock, 1yr cover etc for £3100.
although when you look at it 3100 for a boiler and controls seems a little excessive, i have the assurances of comeback if something breaks plus they can commission there own work.
I am leaning toward going with british gas. would anyone be able to advise whether or not its too much of a risk sourcing the materials myself, and having an independent corgi bloke (or woman) fit the boiler???
ive just set up my own company and will be more than happy to come and give you a quote