I've finally gotten around to drilling the new hole today and have roughly assembled the pipework (still need to fine tune some of the pipe lengths once the sink is in place).
I just wanted to check that the mocked up work looked correct. I cored a 52mm hole so the tee just fits inside, allowing the pipe from the appliance trap to run parallel to the wall. I put the appliance trap on the left, even though the dishwasher will be on the right, to prevent the downpipe from obstructing yet to be installed copper pipes.
Any thoughts would be much appreciated.
I just wanted to check that the mocked up work looked correct. I cored a 52mm hole so the tee just fits inside, allowing the pipe from the appliance trap to run parallel to the wall. I put the appliance trap on the left, even though the dishwasher will be on the right, to prevent the downpipe from obstructing yet to be installed copper pipes.