the lead comes into house then about 15 inches up a compression fitting with copper pipe joins the stoptap then about 10 inches copper before the next compression joint then its back to lead up the wall to upstairs combi boiler
Well I would take a clamp to the copper and connect the bond THROUGH the clamp and onto the soldered lead effort, just as a failsafe incase the solder fails/snaps