What happens if you build a extension and have building regs but no planning permission?
Here's the story:
Doing a 10m side extension, got building inspector involved and all going good with foundation etc. Extension is about to go up and we been told it doesn't come under PD.
Do I carry on with extension(neighbours have no issue with it) or stop work and apply for planning permission
The walls have been knocked out so I'm in a pickle. Current wait for applications is 3 months I'm told.
The side extension is being done along side a Garage Conversion to convert it into a habitable room.
Should I stop work and get the planning?
Here's the story:
Doing a 10m side extension, got building inspector involved and all going good with foundation etc. Extension is about to go up and we been told it doesn't come under PD.
Do I carry on with extension(neighbours have no issue with it) or stop work and apply for planning permission
The walls have been knocked out so I'm in a pickle. Current wait for applications is 3 months I'm told.
The side extension is being done along side a Garage Conversion to convert it into a habitable room.
Should I stop work and get the planning?