Hi all,
Moved into a property in late 2020 and in the process of updating lots of things. There is a large shed at the bottom of the garden which has various lights and sockets inside, this was connected to the house by standard PVC cable which was in some cases just a few inches below the grass, needless to say this is all disconnected currently.
The consumer unit has a separate RCD for the shed which is currently off, the wire ran through a hole in the wall and down the side of the property in what was a lean-to which we had taken down. I would like to renew this cable and also run a new length down the garden.
As far as connection to the consumer unit I will only use a qualified electrician and want to carry out the less skilled work myself.
The question is should I use armoured cable or run (7m approx.) this in suitable trucking along the wall of the house?
For the garden run (25m approx.) I intend to dig a trench 60cm deep laying the cable at the bottom, with a length of barrier tape about 20cm above that, should the garden cable be armoured or in suitable trucking?
There is a possibility that a new shed will be built that could support upto 4kW of solar, so presume the garden length will need to be atleast 4mm^2?
Thanks,
Ant
Moved into a property in late 2020 and in the process of updating lots of things. There is a large shed at the bottom of the garden which has various lights and sockets inside, this was connected to the house by standard PVC cable which was in some cases just a few inches below the grass, needless to say this is all disconnected currently.
The consumer unit has a separate RCD for the shed which is currently off, the wire ran through a hole in the wall and down the side of the property in what was a lean-to which we had taken down. I would like to renew this cable and also run a new length down the garden.
As far as connection to the consumer unit I will only use a qualified electrician and want to carry out the less skilled work myself.
The question is should I use armoured cable or run (7m approx.) this in suitable trucking along the wall of the house?
For the garden run (25m approx.) I intend to dig a trench 60cm deep laying the cable at the bottom, with a length of barrier tape about 20cm above that, should the garden cable be armoured or in suitable trucking?
There is a possibility that a new shed will be built that could support upto 4kW of solar, so presume the garden length will need to be atleast 4mm^2?
Thanks,
Ant