Hi guys
I have submitted drawings for a COL with regards to an outbuilding. I'm thinking of starting prior to receiving the COL. I can't see any reason why I should not be allowed to build this under PD but for peace of mind would appreciate if anybody here can spot if I have missed anything.
I have looked at the planning portal guidance but just want to make 100% sure I haven't made a school boy error prior to starting
1) It is a single storey, cavity wall, pitched roof outbuilding.
2) It is at least 2m from all my boundaries
3) Size is approx 3.3m x 6m. It covers less than 50% of the surface area of my land
4) Maximum eaves height will be 2.5m and maximum height of pitch 4m
5) It will have double glazed windows but no verandas or porches
6) It will have electricity supply and water supply
7) I will check again on Monday to confirm PD rights have not been removed from my area.
Thanks for looking
I have submitted drawings for a COL with regards to an outbuilding. I'm thinking of starting prior to receiving the COL. I can't see any reason why I should not be allowed to build this under PD but for peace of mind would appreciate if anybody here can spot if I have missed anything.
I have looked at the planning portal guidance but just want to make 100% sure I haven't made a school boy error prior to starting
1) It is a single storey, cavity wall, pitched roof outbuilding.
2) It is at least 2m from all my boundaries
3) Size is approx 3.3m x 6m. It covers less than 50% of the surface area of my land
4) Maximum eaves height will be 2.5m and maximum height of pitch 4m
5) It will have double glazed windows but no verandas or porches
6) It will have electricity supply and water supply
7) I will check again on Monday to confirm PD rights have not been removed from my area.
Thanks for looking