Move your cylinder stat down - about a 1/3 up from the base is ideal. Cut carefully and fill the old cutout hole.
Make sure the water level in the F&E cistern is only say 50mm above the feed outlet when the system is cold. Bend the float arm down if necessary.
Make sure the water level in the F&E cistern is only say 50mm above the feed outlet when the system is cold. Bend the float arm down if necessary.