Ah, is that what you're after? Ever thought of becoming a lollipop lady?

PS You'll be delighted to hear I have found a non-compliance in the DIY heating system.
 
Sponsored Links
Oh? What was that, failure to notify building control?
 
Worse. I hardly dare admit it. Shall we say boiler - vent - feed - pump - bypass - valves.

Perhaps not a non-compliance but might explain the pumping over. Currently trying to work out a solution that doesn't involve demolishing the house.
 
Sponsored Links
Are you serious? Where would expansion be taken up - in the feed tank? What happens if the system boils?

What we have (starting from boiler flow) is boiler - pump - auto bypass - MV - vent - HW cylinder - feed - boiler. Note vent is on flow side of cylinder, feed on return, and both of them connect close to cylinder. Predictably, pumping-over only occurs when HW is called. When HW valve is closed it effectively shields pump from vent.

Rads are on a parallel unvented circuit.

Pipework to cylinder is mostly 28mm (hangover from its gravity fed days) with some 22mm. One straight leg of 15mm pipe about 10ft long connects cylinder to F&E tank in loft directly above it. This would be relatively easy to replace. But could we cheat further and use the existing 22mm vent pipe as a feed, simply moving it to bottom of expansion tank and eliminating the current 15mm feed? This would have it feeding to the flow side of the cylinder with 28/22mm all the way.

Why does it need to be 22mm anyway?

Am I stupid or what?
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top