Hi
I've got a plasterer in - the majority of the work is float and set but I've agreed to a few walls to be dot n dabbed.
The plasterer has done the first wall which is small - it literally took up two and a half full sized plasterboards. What has suprised me is the amount of adhesive used for this small area. Almost two bags of 25kg adhesive for one small wall seems a lot (it's certainly quite expensive at around £18 for one wall).
Is the plasterer using too much adhesive or is this about right?
Many thanks
George
I've got a plasterer in - the majority of the work is float and set but I've agreed to a few walls to be dot n dabbed.
The plasterer has done the first wall which is small - it literally took up two and a half full sized plasterboards. What has suprised me is the amount of adhesive used for this small area. Almost two bags of 25kg adhesive for one small wall seems a lot (it's certainly quite expensive at around £18 for one wall).
Is the plasterer using too much adhesive or is this about right?
Many thanks
George