Come on guys what has this got to do with all pole isolations.
Come on Eric - you're the king of waffle
Come on guys what has this got to do with all pole isolations.
Please sir, he started it sir...Come on guys what has this got to do with all pole isolations.
Strictly speaking according the wiring regs, they should be brown, brown, and green/yellow, as it's a single-phase circuit.
I was using the context of something where 3 points are presented - each end of the winding and a centre tap.In that case there are infinite accessible voltages available along the length of a winding depending on where your test probes are put.
So (assuming the voltage was right) a load connected between the centre tap and one of the other two points would not work?In the case of a centre tapped winding, yes there are three measurable voltages but only one is any use as the other two to the centre tap are a reference for safety operation only.
Are we both saying that the 3-wire centre tapped arrangement we've been talking about is 2-phase?I think we're saying the same thing two different ways.
It all depends upon the point you choose as a reference. For a 110V CTE supply, if you use the centre-tap as your reference, then yes, the voltages on each live leg will be 180º out of phase which each other. Use one of the live ends as your common reference point then the voltages as seen at the other end and at the earthed centre point will be in phase (but at different amplitudes).There will be 2 AC voltages present, and they will not be in phase.
Sorry, what's the BGB? The current edition of the wiring regs? If so, then I don't have a copy.Since the BGB was published. As I said before, look at the left-hand diagram in Fig. 3.3 ("Two-phase 3-wire") of 312.1.1 in the BGB. The only way one can get "Single phase 3-wire" is to have two separate secondaries wired in-phase (rather than centre-tapped) - see Fig. 3.2, immediately above Fig.3.3.
That's all you have with a 110V CTE supply. The centre-tap earth isn't a current-carrying conductor (except under fault conditions), merely a connection to reference the supply to earth. It's really no different with a 3-wire single phase supply, except that the centre-tap connection is distributed as a neutral. It doesn't change it into a two phase system just because you've introduced a third wire.If one only has 2 wires, all one can observe/measure is the instantaneous pd between the two - such that, without the third wire as a reference, 'phase' has no meaning.
And in Canada, parts of Latin America, and some parts of the Caribbean. The same system is also used in Japan, just at a slightly lower voltage (100/200). And in all cases it's known as a single phase supply system, just as the similar 3-wire systems in Britain (just at double the voltage) have always been known.So (assuming the voltage was right) a load connected between the centre tap and one of the other two points would not work?
In the US they have just such an arrangement to support 110V and 220V appliances.
Yes, as you kindly emboldened in red when you responded to one of my messages:Sorry, what's the BGB? The current edition of the wiring regs? If so, then I don't have a copy.
a.k.a BS7671:2008 Amendment 1 (2011). If you don't have a copy of the current regs, it's obviously understandable that you don't know what they say. I had assumed that you were a practising electrician, and therefore would understand 'BGB', and have a copy thereof - my apologies.(and the current regs)
You're welcome - and before someone else decides to pull you up on it, FYI the IEE is no more, having metamorphosised into the IET some time ago ... and 'BGB' is 'The Big Green Book'!Thanks for clarifying that. No, not a practising electrician, I'm in data & telecoms work, so although I'm familiar with the IEE regs to some extent, I don't keep up with them and don't know all the latest changes in recent editions.
Thought there was a 0.2 disconnection time on TT?
Which makes it a bit tricky to comply?
Although you've now said that twice, I'm not sure I understand the problem you see. As I understand it, the 0.2 second disconnection time relates to L-E 'faults' - which, as far as the regs are concerned means 'bolted shorts' - i.e. of zero impedance. Even with a poor TT electrode, that will result in at least an amp or two of L-E fault current - and a 30 mA RCD or RCBO will operate in under 0.2 sec at less than 60 mA L/N imbalance, let alone 'an amp or two'. So what's the problem?Thought there was a 0.2 disconnection time on TT? Which makes it a bit tricky to comply?
Since no-one has yet commented on what I recently wrote (above), it is perhaps worth reminding ourselves that (whatever the earthing system) an RCD is the only way to achieve short disconection times in the presence of L-E faults of sufficient impedence to preclude very rapid operation of an MCB.Although you've now said that twice, I'm not sure I understand the problem you see. As I understand it, the 0.2 second disconnection time relates to L-E 'faults' - which, as far as the regs are concerned means 'bolted shorts' - i.e. of zero impedance. Even with a poor TT electrode, that will result in at least an amp or two of L-E fault current - and a 30 mA RCD or RCBO will operate in under 0.2 sec at less than 60 mA L/N imbalance, let alone 'an amp or two'. So what's the problem?
Are the two voltages wrt the centre tap in phase or not?What on earth the IEE is thinking if it's suddenly decided out of the blue to call this "two phase" is anybody's guess.
If you use the centre tap as your reference point, then obviously the voltages at each end are 180º out of phase. That's a natural consequence of the way the transformer works, and is made use of not only for 110V CTE supplies and 240/480 distribution in the UK (or 100/200 - 120/240 elsewhere in the world), but also for driving balanced audio & data lines, as a phase splitter for class B amplification, and similar applications. But you only see that phase difference in the voltages because you're using a mid point of the winding as your reference point.Are the two voltages wrt the centre tap in phase or not?
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local