I've just moved into a Victorian property with a cellar that I'd like to convert into a proper utility area for now and liveable space in the long-term. There are effectively three rooms in the cellar: one below the hallway, one below the living room (front) and one below the dining room (rear). The dining room is relatively uncomplicated, there is a flourescent tube over a workbench on one side and a single wire running to the boiler at the rear corner of the property. Similarly, there isn't much going on beneath the hallway.
The same cannot be said for the space beneath the living room. A bundle of around 7 three-core cables runs diagonally across the room, a separate bundle runs along one wall, there is a ceiling rose in the middle of the room and a series of junction boxes by the bottom of the stairs. This appears to be a very poor job as the several of the junction boxes are simply taped shut.
There are electircal outlets dotted around all three rooms on this level and all of the wires are fixed to the lath and plaster ceiling which really needs to be pulled down and replaced at some point.
Where would you start with something like this? I had a spark in at the weekend fitting some new plug sockets and when I showed him the cellar he seemed a bit overwhelmed by it all. Would it be worthwhile breaking it down into smaller tasks e.g. removing the lights, removing the plugs and then re-routing the cables in a way that - once the ceiling had been pulled down - would allow them to be tucked into the space between the joists?
The same cannot be said for the space beneath the living room. A bundle of around 7 three-core cables runs diagonally across the room, a separate bundle runs along one wall, there is a ceiling rose in the middle of the room and a series of junction boxes by the bottom of the stairs. This appears to be a very poor job as the several of the junction boxes are simply taped shut.
There are electircal outlets dotted around all three rooms on this level and all of the wires are fixed to the lath and plaster ceiling which really needs to be pulled down and replaced at some point.
Where would you start with something like this? I had a spark in at the weekend fitting some new plug sockets and when I showed him the cellar he seemed a bit overwhelmed by it all. Would it be worthwhile breaking it down into smaller tasks e.g. removing the lights, removing the plugs and then re-routing the cables in a way that - once the ceiling had been pulled down - would allow them to be tucked into the space between the joists?