Thanks guys, I will try and trace the cable back up above the ceiling, if I find a decent void space above I will move the two Junction boxes into it and run new lengths of cable to my first new socket, failing that I will keep tracing it back to the next socket or the CU.
Thanks for all your help! (although I still think there should be a purpose designed piece of kit for safely joining a hidden or buried cable!!!)
Phil
+++++++++++++++
P.s, yes there was already a box in the wall, ideally I did not want a blanking plate but I would have done that if I had too, problem is a 20amp JB will fit in a double metal box but a 30 will not - and I had 2 of them to go in! This was b4 crimping was mentioned, but that again brings me back to there being a lack of kit for this situation, a replacement metal box with connectors in it or a blanking unit with terminal connections on the back of it would have made the job so much easier!!
Looking back it may have been best to leave a double socket there - halfway up my wall!
Cheers again!
__________________________
moderator
please note 10a
Thanks for all your help! (although I still think there should be a purpose designed piece of kit for safely joining a hidden or buried cable!!!)
Phil
+++++++++++++++
P.s, yes there was already a box in the wall, ideally I did not want a blanking plate but I would have done that if I had too, problem is a 20amp JB will fit in a double metal box but a 30 will not - and I had 2 of them to go in! This was b4 crimping was mentioned, but that again brings me back to there being a lack of kit for this situation, a replacement metal box with connectors in it or a blanking unit with terminal connections on the back of it would have made the job so much easier!!
Looking back it may have been best to leave a double socket there - halfway up my wall!
Cheers again!
__________________________
moderator
please note 10a