Hey guys I know theres been a couple of posts on this but I'm still a bit unsure.
I'm about to stat building a shed so would like to bury the electrics before I start.
I have a spare 10mm cable that was used for an electric shower which I've taken out. I was going to connect the 10mm cable to a 13a powebraker fcu in the house to 6mm cable.
Run the 6mm cable to the shed (approx 15m) where I would conect the 6mm cable to 2.5mm via a Junction box and link 4 sockets in series.
How does that sound?
I'm about to stat building a shed so would like to bury the electrics before I start.
I have a spare 10mm cable that was used for an electric shower which I've taken out. I was going to connect the 10mm cable to a 13a powebraker fcu in the house to 6mm cable.
Run the 6mm cable to the shed (approx 15m) where I would conect the 6mm cable to 2.5mm via a Junction box and link 4 sockets in series.
How does that sound?