You take a live from Ls, a neutral from Ns and a switch live from Lr to a central wiring center.
From there you take a live to each stat com, and a switch live to each MV.
All the oranges connect together and join Lr.
A programmable stat allows individual control over the 3 zones.
From there you take a live to each stat com, and a switch live to each MV.
All the oranges connect together and join Lr.
A programmable stat allows individual control over the 3 zones.