This is my first self build project so im learning the hard way
So ive set the levelling stake at 600mm depth at the lowest end (BCO said 300mm minimum) and levelled the stakes all the way round, the last stake was level with the first so thats a good sign..... At the highest point the stake was only showing 200mm so i am going round the trench and taking off the bottom to level it off so that all stakes have a minimum depth of 400mm.
So the concrete depth now varies between 400mm to 700mm depending which part of the trench but it is level across the stakes.... Long way round i i know and a lot of graft but i wasnt comfortable.with creating steps as a newbie. Thanks guys
So ive set the levelling stake at 600mm depth at the lowest end (BCO said 300mm minimum) and levelled the stakes all the way round, the last stake was level with the first so thats a good sign..... At the highest point the stake was only showing 200mm so i am going round the trench and taking off the bottom to level it off so that all stakes have a minimum depth of 400mm.
So the concrete depth now varies between 400mm to 700mm depending which part of the trench but it is level across the stakes.... Long way round i i know and a lot of graft but i wasnt comfortable.with creating steps as a newbie. Thanks guys