noseall said:replace the soil stack with a plastic one. piece of cake. the connection, just below ground, can be done with one of these,http://www.flexseal.co.uk/products/fern-straight.htm
spoke to the old man today and he agrees with the above, so one day in the week I will dig the floor to see where the cadt pipe connects to clay and take i out and make way for the plastic