- Joined
- 7 Sep 2022
- Messages
- 3,261
- Reaction score
- 863
- Country
Proper? I agree to do away with the joists, 200mm of king span seconds on the slab (cheap as and wibblywobbly as you like), clip the UFH pipes to it then pour a liquid screed over the top. Isolate your screed from your walls with more insulation