If, for the purpose of an example, one considers a fault current of 500A and a corresponding MCB operation time of 5 seconds (very pessimistic), then for steel armour (thermosetting SWA at 90°, 'k'=46), the required armour CSA would be about 24.3mm², per 'the' (actually 'a') adiabatic equation.