We are converting our double garage into two rooms. We have put down 50mm PIR insulation and 50mm timber joists to add strength for the area which will be used as a gym. We have put T&G chipboard on top in that room, but stupidly haven't staggered the joins.
What is the worst that could happen? We could undo it as we haven't gone any further but it will be a pain. We are wondering how much of a problem it is, as all of the floor is supported (the entire floor is PIR and timbers). And on top of the chipboard will be underlay, then LVT, then thick gym rubber floor mats. Will all of this make it secure enough? We have glued the T&G joins but not screwed down.
Do we have to undo what we've done - very sad about that possibility
What is the worst that could happen? We could undo it as we haven't gone any further but it will be a pain. We are wondering how much of a problem it is, as all of the floor is supported (the entire floor is PIR and timbers). And on top of the chipboard will be underlay, then LVT, then thick gym rubber floor mats. Will all of this make it secure enough? We have glued the T&G joins but not screwed down.
Do we have to undo what we've done - very sad about that possibility