I need to replace the standard single-phase feed into a property with three-phase.
What's the procedure? I've got a ground contractor installing a new drive & path. It's obviously the right time to put the 3-core, N & E SWA in.
I've already put a new water main in in readiness. If I liaise with the elec supplier, will I (or my contractor) be able to lay the cable and leave ready for connection?
Need to get the surface down asap. before the postman falls down a hole!