Hmm.....i 'think' i get the jist of what you mean, but either way it looks like the leading needs to profile over the top of the tiles? Which seems to be my main issue as bashing it to fit would break the tiles.
In the bottom drawing, is the 'cc' a gap between tile and gable end which is covered by lead to act as a gutter? If so, then it folds to sit on top of the tile which still requires profiling?
Am i understanding this correct or am i so wide of the mark i could be in another country?
In the bottom drawing, is the 'cc' a gap between tile and gable end which is covered by lead to act as a gutter? If so, then it folds to sit on top of the tile which still requires profiling?
Am i understanding this correct or am i so wide of the mark i could be in another country?