Finished the hall flooring today. Well, I still have to do the threshold section to the lounge (Have to cut into door frame) and make good all the skirtings. Tomorrow I’ll crack on with the kitchen/diner. The multi tool and impact driver have been worth their weight in gold.
I’m surprising myself with the standard of my work - normally I run out of patience - it would be getting on my tits by now and I’d be doing sloppy work. Must be a combination of old age/boredom doing nothing/lockdown.
View attachment 202588