thanks steve, i must be on the ring main as i have two cables into the one and only socket in this room, if i want to extend it which type of junction box do i need a three way or four way? and what gauge for the crimps as i have one a 3 way that will take up to 15m2 will this be ok to use?
i've just sorted out the wires that were sitting on top of the heating pipes and re-routed them now i will take one of the cables off and add it to the socket i want to put in
just one final note, how can i make sure this is actually a ring main.. and can anybody work out what that extra cable is from that was powering a heater?
i thought maybe it was a timed circuit but i have nothing as such on the cu
ta
i've just sorted out the wires that were sitting on top of the heating pipes and re-routed them now i will take one of the cables off and add it to the socket i want to put in
just one final note, how can i make sure this is actually a ring main.. and can anybody work out what that extra cable is from that was powering a heater?
i thought maybe it was a timed circuit but i have nothing as such on the cu
ta