Hi,
Hoping someone can answer this. I am having 5 x 50w mains downlights fitted into my kitchen whilst the ceiling is being replaced. Have had 2 quotes from electricians but both offer different methods of how they plan to do the job. i'm assuming both are correct as they're both electricians just wondering if anyone had any thoughts on which is "better".
They both plan to replace the existing ceiling rose with a junction box.
The first stated he would use 1.5mm heat resistant rubber cable and go from JB to light 1 then from light 1 to light 2 and so on up to number five and finish at number 5.
The second plans to do the same but use 1mm heat resistant PVC cable and return from number 5 to the JB.
Anyone got any thoughts...?
Hoping someone can answer this. I am having 5 x 50w mains downlights fitted into my kitchen whilst the ceiling is being replaced. Have had 2 quotes from electricians but both offer different methods of how they plan to do the job. i'm assuming both are correct as they're both electricians just wondering if anyone had any thoughts on which is "better".
They both plan to replace the existing ceiling rose with a junction box.
The first stated he would use 1.5mm heat resistant rubber cable and go from JB to light 1 then from light 1 to light 2 and so on up to number five and finish at number 5.
The second plans to do the same but use 1mm heat resistant PVC cable and return from number 5 to the JB.
Anyone got any thoughts...?